Showing posts with label Capital Projects. Show all posts
Showing posts with label Capital Projects. Show all posts

Saturday, July 18, 2009

Capital Projects Reliability Best Practices

The Projects practices are centered around the following principles:

  • I get the organization involved early and gain consensus on project scope before moving forward with detailed design
  • I have frequent checkpoints with stakeholders in the process design and detailed engineering phase to make sure I will deliver a quality project.
  • I design for the long term (safety, reliability, quality)
  • I optimize resources and execute only the agreed scope during the construction phase of the project.
  • I deliver a complete project with key drawings, spare parts, baseline inspection, and long term equipment plans (RBI, etc).

Key Projects Practices

  • Scope Definition

  • Project Leadership

  • Scope Control

  • Organizational(owner) Interfaces

  • Engineering

  • Operability

  • Maintainability

  • Constructability

  • Designing in Reliability and Safety

  • Cost Control and Tracking